Floor Vents Now Available!

All-Trimz Inc.

info@all-trimz.com

  • Home
  • Products
    • Stair Nosings
    • Transition Moldings
    • Floor Vents
    • Services
  • Installation
  • Warranty
  • Our Philosophy
  • Connect With Us
  • More
    • Home
    • Products
      • Stair Nosings
      • Transition Moldings
      • Floor Vents
      • Services
    • Installation
    • Warranty
    • Our Philosophy
    • Connect With Us
All-Trimz Inc.

info@all-trimz.com

  • Home
  • Products
    • Stair Nosings
    • Transition Moldings
    • Floor Vents
    • Services
  • Installation
  • Warranty
  • Our Philosophy
  • Connect With Us
Stair Nosing Installation - PL construction adhesive

Installation Guidelines

Helpful tips for DIY installation of stair nosings and transitions

STAIR NOSING (FLUSH OR OVERLAP)

Installation Guide

Profile Specs

Flush - To finish the end of a step by creating flush stair treads & returns


Overlap - To finish the end of a step by creating a small lip for traction at the edge of the stair tread


Installation Guide

  1. Measure the width of the step and cut to length.
  2. Apply a generous bead of LePage PL Premium along the underside of the stair nose and on the front of the underside of the nose.
  3. Carefully roll the stair nose into place against the front of the step, making sure the transition is in place. Once the transition is in its desired position, press down firmly over the entire stair nose, making certain the transition is in place and tight against the riser. For added security, you may use finishing nails.
  4. Tape down using painters’ tape until adhesive has set


***ALL nosings MUST be glued down using PL construction adhesive. Failure to do so, voids ALL warranties and liability***

Reducers

Installation Guide

Profile Specs

Reducer - To fill the gap and transition between floors of unequal height


Installation Guide

  1. Install the flooring leaving a 1” gap between the two floors for the surface reducer installation.
  2. Measure and trim to fit.
  3. Apply LePage PL Premium down the center of the 1” gap.
  4. Press molding into adhesive and tape down using painters’ tape until adhesive has set.

T-MOLDS

Installation Guide

Profile Specs

T-Mold - To fill the gap and transition between floors of equal height


Installation Guide

  1. Install the flooring leaving a 1” (TM) or 1½” (TM2) gap between the two floors for the t-molding installation.
  2. Measure and trim to fit.
  3. Apply LePage PL Premium down the center of the 1” (TM) or 1½” (TM2) gap.
  4. Press molding into adhesive and tape down using painters’ tape until adhesive has set 

Copyright © 2022-2024 All-Trimz Inc.  - All Rights Reserved.

Powered by GoDaddy Website Builder

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept